Communication Engineering
1000kV Zaozhuang Substation construction project

1632450250578241.jpeg1632450504161069.jpg

The total investment of 1000 kV ultra-high voltage power transmission and transformation project in Zaozhuang is more than 3 billion Yuan. After completion and operation, it will bring strong clean power for the economic development of Zaozhuang and realize the "foreign power into Zaozhuang". The maximum power load of Zaozhuang is 9.8 million kw, calculated according to the maximum load of zaozhuang in 2018 of 304 kW.

It can meet three times the growth demand of Zaozhuang and become a powerful power engine to speed up the transformation of old and new kinetic energy in Zaozhuang.